Energy

Parabolic trough plant Casablanca

Image Gallery
Prev Next
Casablanca, planta CCP de 50 MWe Casablanca, planta CCP de 50 MWe 2 Casablanca, planta CCP de 50 MWe 3 Casablanca, planta CCP de 50 MWe 4 Casablanca, planta CCP de 50 MWe 5 Casablanca, planta CCP de 50 MWe Casablanca, planta CCP de 50 MWe Casablanca, planta CCP de 50 MWe Casablanca, planta CCP de 50 MWe
Casablanca, planta CCP de 50 MWe
Casablanca, planta CCP de 50 MWe 2
Casablanca, planta CCP de 50 MWe 3
Casablanca, planta CCP de 50 MWe 4
Casablanca, planta CCP de 50 MWe 5
Casablanca, planta CCP de 50 MWe
Casablanca, planta CCP de 50 MWe
Casablanca, planta CCP de 50 MWe
Casablanca, planta CCP de 50 MWe
  • Client: COBRA Sistemas y Redes (ACS)
  • Country: Spain
  • Start date: 2012
  • Ending date: 2013
Download datasheet

Power generation plant of 50 MW located in Talarrubias, Badajoz, Spain.

The technology of the plant is parabolic through collectors. The owner is COBRA Systems y Reds (ACS). SENER is the EPC risk sharing partner and responsible for the complete design.

  • Project Data:
  • Total mirror surface: 510.000 m2.
  • Number of SCA/loops: 624/156 (SENERtrough®).
  • Field surface area: 195 Ha.
  • Nominal solar field thermal output: 262 MWt.
  • Thermal Storage Capacity: 1.010 MWht (7h).
  • Turbine capacity: 50 MWe.
  • Contract type: EPC.

Other programs

See all
Share
Share:
Contact Up Up