RENEWABLES, POWER, OIL & GAS

Control Tower - Third Set of Locks for the Panama Canal

Image Gallery
Prev Next
Torre canal de panamá Torre canal de panamá Torre canal de panamá
Torre canal de panamá
Torre canal de panamá
Torre canal de panamá
  • Client: GUPC (Grupo Unidos por el Canal)
  • Country: Panama
  • Start date: 2014
  • Ending date: 2018
Download datasheet

Control tower for the third set of locks for the Panama Canal, Panama.

The control tower for the Third Set of Locks for the Panama Canal represents the most singular vertical building among this huge complex. For this reason, its design has meant a great deal to achieve a solution that complies with the specific technical and functional requirements using a high quality architectural language.

  • Scope:
  • Architectural and functional design of the tower
  • Detailed design for all disciplines
  • Site supervision
  • Implementation, coordination and management of BIM

Other programs

See all
Panama Metro Line 1

SENER has participated in all stages of the project from since the initial design untilconstruction [+]

Share
Share:
Contact Up Up