  • Client: FERMACA PIPELINE DE LA LAGUNA
  • Country: Mexico
  • Start date: 2016
  • Ending date: 2018
  • Hours contract: 650.000
  • Engineering hours: 60.000
Download datasheet

Compression station La Laguna, La Loma, Durango, Mexico.

SENER is reponsable of the engineering, procurement, construction and ttart-up of the  Natural Gas Compression Plant.

2 SIEMENS STG 400 Turbo Compressor Units were installed to handle up to 1320 million cubic feet per day and a maximum pressure of 1100 psi, refrigerated by dedicated Aero refrigerators for each Turbo Compressor.

The extent of the Project includes:

  • Buildings
  • Roadways
  • Distributed Control System (DCS) – Gas and Fire and Emergency Shutdown
  • All of BOP
  • A 1500kw diesel electricity generation system
  • The whole electrical installation at medium and low tension

Project included in the Natural Gas Transport System owned by the FERMACA group, the main Mexican operator, operating this trunk system for the import and distribution of natural gas from the United States across the centre of Mexico: El Paso (USA) – Chihuahua – El Encino – La Laguna – Aguas Calientes – Guadalajara – Villa de Reyes

Other programs

See all
Norte combined cycle plant

Norte combined cycle plant

Norte combined cycle plant, Durango, Mexico. Comisión Federal de Electricidad (CFE) adjudged to the company Unión Fenosa [+]

Share
Share:
Contact Up Up